It’s always difficult to finish. It’s even more difficult to finish a project as large (70,000 sf), out of masonry and through two winters in a little over a year! The Grand Opening party is scheduled for June, but the hotel will open its doors before that. The contractors who have seen that every joint is caulked, ever louver installed, and that each fan is drawing the required air, have been a blessing to the architect. I am thankful that each member of the team cared as much about providing the owners and the Marriott brand with a hotel that is of the utmost quality. Not only were things finished the right way, but they were finished the best way. Thank you, thank you. Come and visit the hotel for yourself soon!